Waeco SP-900 Installation Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Scope of delivery
CoolAir
34
4 Scope of delivery
CoolAir SP-900
5Installation
a
Caution
The air conditioner may only be installed by qualified personnel from a
specialist company. The following information is intended for specialists
who are familiar with the guidelines and safety precautions to be applied.
5.1 Prescribed installation method
The condenser unit (see Fig. 1 on page 3, 2) is attached to the firm and
straight rear panel of the cab or by means of a firm fastening frame. The
evaporator unit (see Fig. 1 on page 3, 1) is fitted on the inside of the rear
panel of the cab.
I
The connection line (see Fig. 1 on page 3, 3) can only be installed after
fitting the evaporator unit and the condenser unit.
The condensation from the evaporator unit is automatically drained off.
This purely physical function is only possible within certain angles of incli-
nation of the cab. Horizontal inclination during operation should not exceed
10°, vertical forward inclination should not exceed 18°.
The lorry's split air conditioner consists of the following components:
Part designation Quantity Item no.
CoolAir SP-900 air conditioning unit
consisting of:
- Condenser unit
- Evaporator unit with connection line
1 9100100002
4442700183
4442700184
Remote control (incl. type CR2025 battery) 1 4441600084
Battery cables 2 x AWG 8 1 4441300097
Operating manual 1 4445100326
Installation manual 1 4445100327
Installation template, evaporator unit 1 see
packaging
Installation template, condenser unit 1 see
packaging
No. in fig. 15 Designation
1 Condenser unit
2 Evaporator unit
3 Connection lines
SP-900-Install.book Seite 34 Montag, 25. Januar 2010 4:53 16
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 28 29

Comments to this Manuals

No comments